+94 71 8058888 +94 77 2808828
OUR PAST PROJECTS • Construction of Linear Park Along Beira Lake (1.0 Km) – Stage 2 (LKR 190,604,099.34) • Refurbishment of Four Storied Building to Pharma School (LKR 31,795,177.79) • Geo Membrane Pond Liner – 6 Shrimp Ponds (LKR 24,385,000.00) • Second Floor of Kalubowila CSC Building (LKR 13,705,851.60) • Storm Water Drain – ITC & Shangri La Hotels (LKR 10,470,543.44) • Rain Water Harvesting System (LKR 8,500,000.00) • Geomembrane – Udawalawa Carp Centre (LKR 6,062,561.25) • Zn/Al Roof – Kalubowila CSC Building (LKR 575,360.00) • Interlock Paving – Kalubowila (LKR 539,300.00) • Covering Structure – Corporate Office Building (LKR 316,649.25) • Demolition of Depot Building – Kalubowila (LKR 255,100.00) Additional Past Projects: • Irrigation Systems – Badulla District (LKR 65,860,304.30) • Senura Aquaculture JV – Ponds, Pipelines, Electrical (LKR 284,183,215.00)
• Irrigation – Kandaketiya (LKR 35,212,936.48) • Irrigation – Passara & Hali Ela (LKR 27,786,248.14) • Asphalt Overlay – Ella to Ketepola (LKR 155,866,365.20) • Asphalt Overlay – Pallekada to Watakurugala (LKR 161,864,844.40) • Rehabilitation – Mulediyawala Gamakanda Road (LKR 98,294,399.00)
© 2025 Sunway Global (Pvt) Ltd. All Rights Reserved, Developed By Masterwebslk Team.